>

Simdega: Road from Pritam Chowk to Barsloya dilapidated for five kilometers, problems

Dharamveer Singh, Simdega:

The condition of the road from Konsode Pritam Chowk of the block to Barsloya via Ketungadham has become quite dilapidated. The distance from Konsode Pritam Chowk to Ketungadham religious place is about 5 kilometers. It has become difficult for people to walk on this path. There are big potholes in the road. Due to potholes, accidents happen every day. There is also a possibility of a major accident. People are facing a lot of difficulties in commuting to the block headquarters during the rainy season. Is. The condition of the bridge has also become pathetic. The bridge over Malago river connecting Kolebira block and Bano block has also been damaged. People of more than half a dozen villages travel through this route. Due to the collapse of the bridge, the movement of people of more than half a dozen villages will be disrupted.

The movement of hundreds of people from Barsloya, Kuruchdega, Bhinjpur, Jamtoli, Virta, Jaldega villages depends on this route. Children also go to Saraswati Shishu Mandir, Lachragarh and Bano to get higher education via Barsloya, Ketunga, Pritam Chowk. Children are facing a lot of inconvenience due to dilapidated roads.

the villagers said

Jyotish Surin said that applications were given several times to repair the damaged bridge and dilapidated road. But no initiative was taken. Due to which people are facing a lot of inconvenience. Ajay Singh said that at the time of elections, public representatives come and leave after giving assurances. Do not take any initiative for road repair. Tulsi Goswami said that the devotees visiting the temple during the month of Sawan also faced a lot of problems. People are facing a lot of problems due to the bad condition of both the roads from Ketunga to Pritam Chowk to Mandir Barsoya. Ayub Surin said that children face a lot of trouble in going to school during the rainy season. Mahima Manisha Surin said that due to the dilapidated road there is a lot of inconvenience in commuting to the block headquarters. Navami Surin said that applications were given several times for road repairs. But no action was taken.

bridge pillar damaged

The pillar of the bridge built across the Malgo river connecting Ketunga and Barsloya has also been damaged. If the bridge is not repaired in time, the bridge can collapse any time. If the bridge breaks, the villagers of Barsloya will face a lot of trouble in going to Bano. Villagers go to Bano railway station via this route to catch the train. Villagers said that several applications were made to the local public representative, MLA and MP in this regard but no initiative was taken.

What does the chief say?

Konsode head Sita Kumari said that the road from Pritam Chowk to Barsloya via Ketunga is quite dilapidated. People are facing a lot of problems. The Deputy Commissioner has been informed about the said problem and a demand has been made to get the road constructed soon.

Leave a Comment